0111Gmhtp Pumping25 Zoom
396 Stroker Motor - Air Induction - Pumping Up, Part 2
Installing the SuperRam runners isn't as easy as it looks in this photo. Aaron Strope and technician Roger Creech spent about an hour prepping the runners prior to installing them. This consisted of enlarging the bolt holes, massaging the Allen head fasteners (some needed to be cut slightly or the heads narrowed for clearance), and removing some of the rocker arms to get at the lower runner bolts. Note that the EGR valve and sensor pigtail has already been swapped over from our old manifold. View Related Article
|
|